Download MS Project Full Project Management Software for MS Office

Project Management in general or construction management in particular is a very significant and important part of any civil engineering projects that includes labour, activities that has specific duration and some resources like machinery or time as well. A project by  a particular definition can be defined as;


What is Project

A project is a set of connected activities that have duration and a single goal that has to be completed in time and according to specification.

What is Project Management

Typical Project Management includes following;
•    Work breakdown structure
•    Project network of activities
•    Critical path method (CPM)
•    Resource management
•    Resource leveling
•    Risk assessment

Different techniques are employed to do the management in a project like PERT (program Evaluation and Review technique) method, CPM (critical Path Method). These all techniques include lengthy calculation and are very hectic to do that by hand.

Project Management and MS Project

 

So for our ease different companies have made Project Management tools like Primavera by Oracle and MS Project by Microsoft. They have a very easy to use interface where you can solve the network diagrams on a single click and generate important reports like gantt chart etc. Also you can perform typical project management activities like Scheduling and Crashing of activities etc.
In this post I am sharing with you very basic and easy to use software for project management i.e. Microsoft Project 2007 or MS Project 2007 it is a MS Office by part that comes with variety of diversity and functionality.

MS Project and Civil Engineering

In field of civil engineering both softwares are used i.e. Primavera and MS Project but most companies prefers Primavera which is a bit professional than MS office. But before you go to learn Primavera its very handy to learn MS Project for your basic knowledge.

MS project sometimes referred as MS Office Project is an Office compatible Project Management tool that helps users to set realistic goals for project teams and customers by creating schedules, distributing and assigning project resources, managing budgets. It helps you in generating reports and charts. MS Project comes with customizable wizard that walks users through the process of Project creation, from assigning their task and resources to reporting the final results.

Typical Gantt Chart in MS Project 2007

About the download (MS Project 2007)

 

This download includes 485 MB *.Zip file that has the main setup file along with the Serial Numbers and Keygen that is required.
The version of the software is 2007 so you might need MS Office 2007 installed. This version is the most stable version than others like 2010 and 2013, we will be sharing them soon as well.

Keywords for Download MS Project

 

free download ms project 2010 full version, download ms project 2007, download ms project 2010, 
download ms project 2010 standard, download ms project 2003,free download ms project 2003,download ms project 2007 trial version, download ms project viewer

Download MS Project 2007 Full

 

The Content is for Members Only !!!

This Software is available to download only for our Bronze, Silver & Gold Level Members, you can simply click the button below to signup / login for your membership & Download. Download this Software

From Editor\’s Desk

The Software name and its title and all the things in it are the trademark of respective owner/author, we here on iamcivilengineer doesn’t host the Software neither uploaded it we are just sharing here the links to download; and are just for sharing it for student and education purpose; if you have any problem about this link or Software you can contact us via contact us page or email at admin@iamcivilengineer.com

Your Feedback

I hope you will like this sharing; stay tuned for the remaining updates about this topic; and don’t forget to share it to your friend and buddies on facebook, twitter and gplus.

 

12 Comments