Get our all latest and free stuff by subscribing to your youtube channel for FREE. 

Uncategorized

big rig Bauer BG 24 H construction site

With the demolition of the buildings at the Gustaf Gründgensplatz, Duesseldorf, the Kö Bogen 2 project began. The old underground car park ist demolished by enterprise Kliemt. The two Hitachi make something so. The CAT 345 makes the old parking garage small with the demolishen tongs. Because of ground water and buoyancy, the third floor is filled with gravel


[youtube https://www.youtube.com/watch?v=qGlcTxnwYIQ]

About author

Saad is a civil engineer by profession and love to explore innovative ideas relevant to construction, civil engineering, and home improvement. He loves writing about concrete, DIY guides, home improvement tips, technologies, and more.
    Related posts
    Construction IndustryContractor's EquipmentUncategorized

    6 Costly Mistakes to avoid while hiring the Home Builder

    Uncategorized

    What Is CNC Machining? 6 Most Common CNC Machines

    Home GuidesUncategorized

    Prestige Marigold Plots in North Bangalore

    Uncategorized

    ELECTRICAL DESIGN COURSE

    Sign up for our Newsletter and
    stay informed

    Leave a Reply

    Your email address will not be published. Required fields are marked *