<script async src="//pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script> <ins class="adsbygoogle" style="display:inline-block;width:700px;height:150px" data-ad-client="ca-pub-1708446456954330" data-ad-slot="5571919601"></ins> <script> (adsbygoogle = window.adsbygoogle || []).push({}); </script> </br>


<script async src="//pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script> <!-- withing post start download --> <ins class="adsbygoogle" style="display:inline-block;width:728px;height:90px" data-ad-client="ca-pub-1708446456954330" data-ad-slot="8882756809"></ins> <script> (adsbygoogle = window.adsbygoogle || []).push({}); </script>

Dismantling of Yonghemen Flyover Jiangxi Province by 68 excavators

A total of 68 excavators were dispatched on Friday night to remove the Yonghemen Flyover, which was a vital road of downtown Nanchang in southeast China’s Jiangxi Province.

Add caption


The area affected by the dismantling of the flyover will be cleared by Monday when traffic is expected to resume. The move came as a new subway line, Nanchang Subway Line 2, is set to pass through the area to help ease traffic volume.

According to ncnews.com.cn, a local online news portal, during rush hours, 5,000 vehicles on average pass through the area. It is estimated that there are around 750,000 motor vehicles around the city, and the overpass could not help ease traffic gridlocks.

Built in 1992, Yonghemen Flyover stretched 504 meters in length, and 14.8 meters in width. It covered an area of 6,180 square meters, and had two traffic lanes on each side.


Dismantling of Yonghemen Flyover Jiangxi Province by 68 excavators
Hurry Up !!! - Just join the 10k+ fans of ours on Facebook and get real updates Iamcivilengineer

Monday, August 29, 2016

Dismantling of Yonghemen Flyover Jiangxi Province by 68 excavators

Post a Comment

MKRdezign

Contact Form

Name

Email *

Message *

Powered by Blogger.
Javascript DisablePlease Enable Javascript To See All Widget