As per the definition, the pile cut off level is the elevation up to which the concrete of the pile head is chipped or cut off while exposing rebar. It is an important design parameter in case of pile foundation that allows the rebar of pile to embed in pile cap and uniformly distribute the load of the pier thereby acting as one monolithic structure.
All the piles under the pile cap are chipped…
50+ Civil Engineering Materials MCQs
September 7, 2014
Civil Engineering Materials includes the introduction as well as detailed characteristics of various structural and construction materials used throughout the world, like timber, steel, concrete, bricks, cement etc. Here are 50+ multiple choice questions (mcqs) related to…